Skip to content
Solutions

Load planning for building materials

Tiles and bricks fill the payload before they fill the trailer — and push weight onto one axle.

Short answer

CargoDuo plans tile, ceramic and building material loads in 3D, stops at the payload and every axle limit, spreads the weight along the deck and plans what does not fit into the next truck.

Load planning for building materials

What gets in the way today

  • Dense pallets reach the payload with half the deck empty.
  • Heavy pallets in the wrong place overload the drive axle.
  • Over-weight trucks are found at the weighbridge, with fines.

How CargoDuo handles it

  • Payload and axles

    Every plan stops at the payload and keeps every axle within its limit.

  • Weight spread on the deck

    Heavy pallets are placed so the load sits where the axles can carry it.

  • Next truck planned

    What does not fit legally is planned into the next vehicle.

CargoDuo axle load panel after re-planning: drive axle 10,830 kg of 11,500 kg, 94.2% and legal

Questions from teams like yours

Why is my truck full at half the deck?

Dense goods reach the payload before the space. The plan shows weight and volume fill side by side.

Can CargoDuo prevent axle overloads?

Yes. Each axle is checked against its limit on every plan and every change.

What happens to pallets that do not fit?

They are planned into the next vehicle instead of being left at the yard.

Try it with one of your own loads

Enter a real shipment and see the 3D plan, the loading order and the axle loads. 7 days free, no card.